Silver One Resources Inc Presentation Update - 2025-05-06 - Detailed Page-by-Page Breakdown...

Presentation Update Summary
This analysis highlights the key updates in Silver One Resources Inc.'s presentation, emphasizing the revised resource estimates, financial position, and project milestones. The most significant change is the updated resource estimate for the Candelaria Mine Project, along with a reduction in treasury funds and an increase in projected production capacity. The following pages contain specific modifications, presented in a professional and precise manner for investor clarity.
Page-by-Page Changes:
Page 1: The presentation date has been updated from March 2025 to May 2025. No other material changes are noted in content, resource estimates, or strategic details.
Page 2: No significant changes between the old and new slides.
Page 3: The resource estimate for the Candelaria Mine Project has been updated to reflect 108.18 million ounces of silver equivalent (Measured & Indicated) plus 29.46 million ounces (Inferred), as per the May 6, 2025, news release. No alterations are observed in warrants, options, outstanding shares, or capital structure.
Page 4: No material differences are present; content remains consistent.
Page 5: The slide's text content is identical; no changes.
Page 6: No significant modifications, with identical text content retained.
Page 7: No material changes noted; content remains the same.
Page 8: No significant updates in the content; text remains unchanged.
Page 9: The investor sentiment metric has been revised from "+9% 2022 vs. 1.2% 2020" to "+9% 2022 vs. 2.9% May 2025," indicating an updated measurement period or outlook. Additionally, the mention of "Jurisdictional issues" now explicitly includes "Tariffs," and references to the US Treasuries selloff have been added. No changes in warrants, options, or share capital are observed.
Page 10: No material changes; content remains identical.
Page 11: No significant modifications; content unchanged.
Page 12: No notable differences; text remains the same.
Page 13: This page has been removed from the presentation entirely; it contained a detailed historical resource estimate for the Candelaria Project, including drill data and resource categories. Its removal indicates a shift away from detailed historical estimates in favor of updated technical reports.
Page 14: The resource estimate for the Leach Pad 1 (22.18 Mt) and Leach Pad 2 (11.45 Mt) has been slightly adjusted—the inferred tonnes for Leach Pad 2 decreased from 11,451,000 to 11,450,000 tonnes. The silver (42.1 ppm) and gold (0.074 ppm) grades remain consistent with prior data. The technical report details and filing status are unchanged.
Page 15: The projected production capacity has increased from 15 to 17, reflecting an upgrade in operational outlook. No other content modifications are evident.
Page 16: No material content change; the slide remains identical in technical detail.
Page 17: No significant updates; content remains the same.
Page 18: No material change; technical and operational details are consistent.
Page 19: No differences; content remains unchanged.
Page 20: No notable modifications; content is identical.
Page 21: No significant changes; text remains the same.
Page 22: No material content updates; information unchanged.
Page 23: No modifications; content remains consistent.
Page 24: No differences; text remains unchanged.
Page 25: No change in content; remains identical.
Page 26: No material updates; content unchanged.
Page 27: No significant differences; text remains consistent.
Page 28: No notable modifications; content unchanged.
Page 29: No material change; text remains the same.
Page 30: No differences; content remains identical.
Page 31: No significant updates; text unchanged.
Page 32: No modifications; content remains the same.
Page 33: No content changes; text remains unchanged.
Page 34: No material differences; content is consistent.
Page 35: This page has been removed. It previously outlined the company's milestones from 2016 through 2024, including project developments and strategic milestones.
Page 36: The treasury balance has decreased from approximately $4.2 million as of September 30, 2024, to roughly $2.7 million as of December 31, 2024. Share count remains at 268,893,369, with fully diluted shares unchanged at 304,596,614. No changes are noted in warrants or options. Shareholder composition remains stable, and trading volumes have slightly increased. No other project or resource updates are present.
Page 37: No significant changes; content remains identical.
Page 38: No material updates; content remains the same.
Page N/A (new pages): Three new pages have been added, providing updated technical details on the Candelaria resource estimate, including specific figures for measured, indicated, and inferred resources, as well as technical notes on the calculation methods and assumptions used. These pages reflect the latest NI 43-101 compliant resource estimates announced on May 6, 2025.
In summary, the most critical changes involve the updated resource estimate for Candelaria, a slight reduction in inferred tonnes for the heap le
Presentation Versions:
- Previous Version: Silver One Resources Inc -
- Current Version: Silver One Resources Inc -